Cement plant dust collection

Crusher dust collection

Cement mill dust collection

Cement kiln dust collection

INTRODUCTION

The equipment in cement plants:
1. Firing workshop: coal pre-homogenization equipment, coal mill, rotor scale, preheater, rotary kiln, cooler, etc.
2. Cement workshop: cement blending, roller press, cement mill, packaging machine, etc.
3. In the raw meal workshop: limestone crusher (hammer crusher, jaw crusher, etc.), stacker and reclaimer for limestone pre-homogenization, and raw meal mill.
4. Various metering belts, belt conveyors, fans, and circulating water systems.

The production process of cement is usually summarized as two grinding and one burning, which is divided into three stages: after crushing the calcareous raw materials, clay raw materials and a small amount of calibration raw materials, they are mixed in a certain proportion, ground and prepared into raw meal with suitable composition and uniform quality. , known as raw meal preparation; the process of calcining the raw meal in a cement kiln to partially melted Portland cement clinker with calcium silicate as the main component is called clinker calcination; adding an appropriate amount of gypsum to the clinker, mixing Materials or admixtures are ground together into cement and packed or shipped in bulk, which is called cement grinding and delivery.

Belt conveyor dust collection

Vibrating screen dust collection

Silo top dust collection

Cement package dust collection

SEE MORE RELATED PRODUCTS

null

Pleated filter bag

null

Filter cage

null

Single Dust collector

null

Long bag dust collector

null

Chamber dust collector